Nonprehensile Obstacle Pushing at <1 ms: Why Closed-Loop Contact Drift Dominates 1-Step Flow Policies
Across 4,200 paired rollouts of parameter-matched U-Net and DiT flow policies on RTX 4060 Ti, sub-millisecond inference still stalls after contact slip—tracing a 13.2× error jump at tick 32 and testing recovery demonstrations.
Sub-Millisecond Inference, Near-Zero Closed-Loop Completion
In this symmetric nonprehensile pushing benchmark, a circular pusher must steer a free-sliding disc around a central cylindrical obstacle into a goal zone above it. Training provides 192 clean demonstrations (96 left, 96 right) with identical initial frames.
Matching trainable action-head parameters within 0.12% (236,290 for U-Net vs. 236,010 for DiT) across 42 configurations × 100 paired seeds on an RTX 4060 Ti, every single-step policy ran well under 1.2 ms—yet closed-loop completion nearly vanished:
Policy Family (1 NFE Chunk Execution) |
Success / 100 | Obstacle Hits | Chunk Latency Mean / P99 (ms) |
|---|---|---|---|
Diffusion-UNet (DDIM) |
0 | 3 | 0.402 / 0.503 |
OT-CFM-UNet |
0 | 67 | 1.141 / 2.296 |
OT-CFM-DiT |
5 | 90 | 0.431 / 1.593 |
2-Rectified-Flow |
0 | 50 | 0.835 / 2.053 |
Shortcut-Flow |
0 | 43 | 0.399 / 0.505 |
Even an 8-step teacher that cleanly committed to 6 left and 6 right initial chunks on 12 held-out scenes scored 0/12 once placed in closed loop.
Diagnosing Tick 32: A 13.2× Covariate-Shift Jump
Inspecting rollout states ruled out initial mode averaging and inference latency. Evaluating the minimum distance to either left or right oracle expert action at the current physical state :
By control tick 32—right as the pusher rounds the obstacle flank and must re-seat against the sliding disc:
- On states visited by the expert trajectory, teacher action error was 17.8 mm;
- On slightly slipped states visited by the policy’s own rollout, error jumped 13.2× to 234.3 mm.
Because clean demonstrations never detach from the disc, the policy never sees how to back off, reposition around the disc’s rear arc, and re-establish pushing force. Straightening generation paths in ODE time (2-Rectified-Flow lowered path velocity deviation by 11.25%, 0.837 → 0.743) or replanning every single tick could not synthesize physical recovery maneuvers absent from the dataset.
Adding Reachable Recovery Takeovers & Pusher-Relative Targets
Collecting 192 expert takeover trajectories initiated from reachable slip and near-stall states—paired with RGB spatial color moments and pusher-relative action deltas —unlocked two-sided single-step routes on the same 100 test seeds:
Shortcut-Flow (1 NFE): 13/100 (12 left, 1 right);OT-CFM-UNet (1 NFE): 10/100 (2 left, 8 right);OT-CFM-DiT: 6/100;2-Rectified-Flow: 1/100;DDIM: 0/100.
While the +3 pp paired difference between Shortcut and OT-CFM (95% CI [-6, +12]) remains modest under a 90-second training cap, this failure mode directly motivated our subsequent 9,600-episode factorial ablation and 3D Dual-SDF contact-retaining guidance.
Measured datasets: 4,200-episode main grid · Tick-32 state-drift diagnosis · Recovery takeover comparison